15/03/2005
A preferred bidder has been selected
A preferred bidder was appointed in December 2004 and the contract will be finalised by May 2005 with construction starting in summer 2005.
A preferred bidder was appointed in December 2004 and the contract will be finalised by May 2005 with construction starting in summer 2005.
Transport for London