Docklands Light Railway - Langdon Park
Skip to navigationConstruction
A contract was signed with Costain Limited in October 2006 for the design and construction of the station. Construction of the station started in Spring 2007 and included:
- Demolition of the existing footbridge
- Installation of the 34 individual platform units
- Construction of new canopies and overhead footbridge
Transport for London

